DD-469 #6: publish reviewed transition protocol v2 and acceptance baseline #23
Labels
No labels
epic
needs-info
needs-triage
ready-for-agent
ready-for-human
svd:fire
svd:go
svd:hold
svd:respec
No milestone
No project
No assignees
2 participants
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
dev/attention-mind-mcp#23
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Decided scope and authority
Child of #6 under the operator standing grant registered verbatim in #6 comment 42500 (SHA-256 fc91e05e770da3139184c2ce21f74c2ccb141ffd3279f7f40cc6b86c249fd693). Mind-spec exact transition protocol v2 PASS/0 is registered verbatim in #6 comment 42606, review fd7dec433c30a201584f98841283441289af01782736a0464aed2b1062e04e80. This satisfies the pre-implementation gate and explicitly permits fresh own-repo child filing/dispatch under default caps. Parent #6 is the scope/authority reference, not a dependency to be closed before this child. Historical exhausted runs are not resumed or extended.
Publish the exact reviewed design and acceptance baseline on main so subsequent bounded implementation specs can bind committed, reviewable bytes. This child is documentation only. No source, runtime, contract, ADR, dependency, credential, IAM, provider request, cleanup, deployment or acceptance execution changes. No product evidence row is discharged. Exact normative content is already ratified; do not re-decide or change its semantics.
Deliverables and fixed write set
docs/planning/issue-6-review-register.mdas a concise present-status companion: link the three documents, #6 comments 42500/42606, exact hashes and the protocol manifest 8616785be5a09c2ab179b69b218da19a3163fc08705e05143ad9924bdf586e5f; distinguish frozen preparation language from the later PASS. State all E01-E15 actual evidence remains owed, v7 finite OBSERVED overall UNQUALIFIED, cleanup activation HOLD for operator-created scoped identity, actual all-writer/in-flight exclusion and fresh separate spec activation. Preserve 57 charged request units, 1,504 charged body bytes, 1,943 request units available, cumulative actual wire UNKNOWN and two v7 objects disposal debt as historical observation; no fresh inventory claim. Child implementation specs must carry this exact protocol/map.docs/planning/implementation-slices.mdbeside slice 4; preserve all unrelated content.No other files are in the write set. Do not add a new ADR or revise attention-v1. Markdown prose uses one paragraph per line. This baseline is
e8b576a40don main; ordinary fresh-run defaults apply. No base override or historical budget change.Acceptance and merge gates
Verify all three byte hashes, file links and the five-file diff. No new tests for a reversible documentation-only change. Run repository-required existing checks as appropriate; no product/provider result is inferred. Every implementing PR, including this baseline, needs independent Standards and Spec PASS with zero open findings, green CI on the exact head, and raw-log audit for command not found, errors during collection, = not found and JSON is_error:true. Report this child and its merge to mind-spec t8g and guide t8t. This child closes only when merged with these gates; it never closes #6, #7, #8, the epic or mind-spec#4.
SVD auto-gate is explicitly authorized by the standing grant for this decided own-repo child; use standard engine/model/rework defaults. The architecture boundary was reviewed exactly to PASS/0; only these frozen documentation bytes are in scope here. If source availability, content hash or agreed scope changes, stop rather than substitute or edit normative text.
Exact reviewed files
docs/planning/issue-6-transition-protocol-v2.mdSHA-256
1aaab9cb149d2575879428eaa9ce42d9b401a582a2ffa9bb44c31d4b2ac82cc2. Frozen source/private/tmp/attention6-qualification-20261119/transition-protocol-v2-proposed/transition-protocol-v2.md.docs/planning/issue-6-acceptance-matrix.mdSHA-256
ebd882de3f0ae232395f9dbe81172ba572acc6be5fb29e1e7aa27d41b9230543. Frozen source/private/tmp/attention6-qualification-20261119/transition-protocol-v2-proposed/acceptance-matrix.md.docs/planning/issue-6-transition-protocol-v2-review.mdSHA-256
fd7dec433c30a201584f98841283441289af01782736a0464aed2b1062e04e80. Frozen source/private/tmp/attention6-transition-protocol-v2-review-20261119.md.⏸ SVD architect gate: dev/attention-mind-mcp#23 dd-469-6-publish-reviewed-transition-protocol-v2-and-accepta
Status: CLEAN after 0 rework round(s) · 0 blocking defect(s) · 0 lens(es) INCONCLUSIVE (could not run) · 0 lens(es) DEGRADED (deterministic denial) · complexity
standard· dispatch effortmediumRun:
20261119T102110Z-508b4cb6Held because: CLEAN but 4 open risk(s) (3 verification · 1 decision) — HOLD-ALL parks everything. The risks, verbatim:
Open risks:
Change: Documentation only. (1) Create the three frozen documents mechanically from the body of issue #23, read through the Forgejo API or the DD note. Run the regex extractor given in the spec: each document is the content of its ````markdown fence plus exactly one trailing LF, written only when it matches its SHA-256. This rule was verified this session: 1aaab9cb… / ebd882de… / fd7dec43… all MATCH, and the variant without the final newline does not. If any hash fails, halt. Never hand-type or format the bytes. (2) Write docs/planning/issue-6-review-register.md, one paragraph per line, carrying the 9-item fact checklist. That covers the full hashes and the manifest 8616785b…; links to #6 comments 42500 and 42606; the frozen-preparation versus later-PASS distinction; E01–E15 still owed; v7 OBSERVED finite, overall UNQUALIFIED; cleanup HOLD conditions; the 57/1,504/1,943/UNKNOWN/two-object debt as historical observation only; and that child specs must bind the exact protocol and map. A recommended draft is included in the spec. (3) Make a one-line edit to implementation-slices.md:20, the slice-4 table row: append (review register) to its Child-issue cell. Lines 58-70 of the slice-4 prose stay untouched.
Files:
docs/planning/issue-6-transition-protocol-v2.md·docs/planning/issue-6-acceptance-matrix.md·docs/planning/issue-6-transition-protocol-v2-review.md·docs/planning/issue-6-review-register.md·docs/planning/implementation-slices.mdDecision: accept the 4 open risk(s) above and dispatch this spec (
svd:go), or park (svd:skip) / re-spec (svd:respec)?Your call (when this issue is held at the gate via
svd:hold):svd:go— approve; Half-B dispatch accepts exactly this spec (open risks accepted)svd:firebesidesvd:go— approve AND authorise the Half-B fire from the phone; never on its ownsvd:skip— park it; dispatch refuses it and the issue stays for a humansvd:respec— discard this spec; the next Half-A run re-produces it with this record as prior-attempt contextSpec:
/Users/piers/.local/state/exhaust/groupthink/specs/2026-11-19-dd-469-6-publish-reviewed-transition-protocol-v2-and-accepta.md— next:codex-svd dispatch --args '<same-json>' --approved-spec-path /Users/piers/.local/state/exhaust/groupthink/specs/2026-11-19-dd-469-6-publish-reviewed-transition-protocol-v2-and-accepta.md✅ SVD architect gate: dev/attention-mind-mcp#23 dd-469-6-publish-reviewed-transition-protocol-v2-and-accepta
Status: CLEAN after 0 rework round(s) · 0 blocking defect(s) · 0 lens(es) INCONCLUSIVE (could not run) · 0 lens(es) DEGRADED (deterministic denial) · complexity
unclassified· dispatch effortunclassifiedRun:
20261119T103107Z-9257ebceFiles:
docs/planning/issue-6-transition-protocol-v2.md·docs/planning/issue-6-acceptance-matrix.md·docs/planning/issue-6-transition-protocol-v2-review.md·docs/planning/issue-6-review-register.md·docs/planning/implementation-slices.mdWrite-set divergence: present table wins. 0 sourceHashes vs 5-row table.
Decision: dispatch this spec (
svd:go)?Your call (when this issue is held at the gate via
svd:hold):svd:go— approve; Half-B dispatch accepts exactly this spec (open risks accepted)svd:firebesidesvd:go— approve AND authorise the Half-B fire from the phone; never on its ownsvd:skip— park it; dispatch refuses it and the issue stays for a humansvd:respec— discard this spec; the next Half-A run re-produces it with this record as prior-attempt contextSpec:
/Users/piers/.local/state/exhaust/groupthink/specs/2026-11-19-dd-469-6-publish-reviewed-transition-protocol-v2-and-accepta.md— next:codex-svd dispatch --args '<same-json>' --approved-spec-path /Users/piers/.local/state/exhaust/groupthink/specs/2026-11-19-dd-469-6-publish-reviewed-transition-protocol-v2-and-accepta.mdspec-verify-dispatch Half B for dev/attention-mind-mcp#23 dd-469-6-publish-reviewed-transition-protocol-v2-and-accepta completed integration verify.
d105c986cacodex-svd ship --run-id 20261119T103407Z-7230ad9c --confirm-merge)