DD-469: publish binding-capable release and complete contract migration gates #168
Labels
No labels
bug
enhancement
epic
needs-info
needs-triage
ready-for-agent
ready-for-human
svd:fire
svd:go
svd:hold
svd:respec
svd:skip
wontfix
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set.
Reference
dev/people-mind-mcp#168
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Completed — 2026-11-15
All gates for this first binding release and inventoried authority migration are complete. The historical checkpoints below retain the evidence available at each stage; their pending statements are superseded by this completion record.
mind-spec-v0.1.0was published at5a610a5e530f439a3e28078e0c6f369645946ceb(tag objectaa861d813fabb9b11d57396531f0871f29a8578e), then verified before any reader pins changed. Bounded release acceptance.33017008c77840f700c42c11e46578b1bc88ee8f; remote main and the unchanged release tag were read back.The next planning brief concerns the portable attention contract. Messages #16 and People #167 retain their separate human decision roles; native attention runtime conformance, optional adapters and runtime extraction remain outside this completed release.
Historical checkpoints
DD-469 / first mind-spec release follow-through. Specification candidate and reader inventory: https://git.groupthink.asia/dev/mind-spec/src/branch/main/docs/migration/consumer-inventory.md
Release act — completed 2026-11-15
Publish the reviewed People binding implementation through the existing operator-only annotated release-tag workflow after it is merged and validation is green.
.woodpecker/release.yamland ADR 0008 reserve release tags to the operator; do not substitute a locally built wheel or image for the accepted packaged-pair gate.Acceptance
Boundaries
First runtime adopter is People’s Mail consumer. Generic Messages consumption remains #167 and the producer remains dev/messages-mind-mcp#16. Native attention is schema-only. Tailcat remains a separate candidate. No live crash/revocation/Forget test is authorised by this gate.
Implementation evidence
Merged and pushed to main: People
fad08dec911a9877cd193beff42cc85e629b7e4b; mind-spec6c74be5. Evidence record covers the shared fixtures, regression suites, clean-revision wheel integration run and non-disruptive live legacy baseline. The release/deployment/authority-transfer acceptance above remains outstanding.Validation for the merged People revision passed: CI pipeline 153, reported success 2026-11-15T01:36:07Z. The release act was the next gate at that checkpoint; see the release progress below.
Release progress
On the owner’s instruction to proceed, validation CI154 passed and annotated tag
v0.2.0-rc.3was pushed through the existing Git release lane. Tag object8531003e5257f89a26adc66de3b6572eb291a096peels toa56a2b9a49a085bfbb621ac61297f5bfa6bc2623. Registry publication passed in CI155. People0.2.0-rc.3digest issha256:6f6c4054174f0874215df05222439e54ff329a8395d6b9ed6e9b953e4d25a29b; its OCI revision matches the released commit. Mail0.15.0isfcd618bba65f30fee918f71c8a66a6187fc2ebad, digestsha256:070dc494bd66d636d9af775d5b09b3c872710dba1d71373c20c1c54d6c38b760, published by Mail CI120. Both registry manifest digest headers match their exact response-body SHA256. Fresh packaged acceptance is in progress.The candidate includes the previously merged schema20→22 changes since rc.2; rc.2 refuses schema22. Deployment preparation therefore includes a verified pre-upgrade backup/restore point and isolated Litestream generations. No production deployment has occurred.
Current source regressions: People binding/contract/recovery 147 passed; Mail peer suites 315 passed plus peer store 43 passed. Row-level evidence records fault mechanisms and limits explicitly. Fresh published I01 passed and was independently reviewed: actual peer termination, 450 pending addresses recovered and drained before polling, stored cursor reuse, and successful local query/health while Mail remained stopped. The observed request-to-sync-end interval was 0.861–1.100 seconds; one missed captured retry request is reconciled by producer/consumer completion records. The first I02 attempt began its idle baseline at 2026-11-15T02:17:09Z but was stopped incomplete when the benchmark fixture was found to have message rows without the peer projection. A fresh attempt then exposed a synthetic preflight UID mismatch before measurement. Both attempts remain recorded; the corrected runner rebuilds and verifies the projection and uses the private credential owner UID. A fresh full 300-second idle plus 3,600-second load run is required; no I02 pass is claimed. Private Piers deployment and backup/restore helpers are prepared and validated offline; live backup, rollout and authority transfer remain pending.
The row-level review identified a literal P01 pre-commit process-termination gap. Mail PR221, merged as
06599a926ea06096bd6f1b505390e06e6d174bb9after CI121 passed, adds the missing SIGKILL/rollback/retry proof and strengthens writer-process restart/cursor evidence for P03. All 95 store tests pass; independent review confirms the fault boundary. Application source, dependency lock and contract bytes remain unchanged from the published Mail release.Corrected packaged run checkpoint
Corrected I02-c passed the authoritative 210,000-entity projection and standalone published Mail preflight before People started. Independent review verified the full 300-second idle baseline (1,491 health probes and 298 search queries, zero failures) and warm RSS capture before any durable peer/staging/support/pending progress. The declared warmup barrier lasted 20.508 seconds. Load began around 2026-11-15T02:42:49Z and must run the full 3,600 seconds; acceptance remains pending until the final result is independently checked. The executed runner and hash are retained separately from its AST-equivalent formatting commit. Draft PR169 has CI156 green at
d597fb6bdf28396596fda576b86027bf2d60f444; the final evidence commit is still owed. No live backup, rollout or authority activation has occurred.