Phase 3: Jev triage and pulled wakes (0.3.0) #8

Closed
opened 2026-10-31 03:45:39 +00:00 by svc-agent-writer · 1 comment

Phase 3 of the roadmap: Jev triage class and wake score per message, with wakes pulled through mail_wakes. Decision: ADR 0003, accepted 2026-10-31 (#35). Shipped in 0.3.0; open only for the exit evidence below.

Target: 0.3.0.

Sub-issues

  • #18 Accept ADR 0003 and record each owner's consent
  • #19 Add the assess container for Jev triage
  • #20 Show the triage class on the read tools
  • #21 Add mailmind replay, the report before the wake rule
  • #22 Add the wake queue and the mail_wakes read tool

Exit criteria

Estate tasks for this phase (owner consent) live on the deploying estate's private tracker.

  • One replay report from a test instance recorded before the wake rule is enabled.
  • A wake from a test instance appears in mail_wakes, and a scheduled Grok Automation reads it and then calls mail_read.
Phase 3 of the roadmap: Jev triage class and wake score per message, with wakes pulled through `mail_wakes`. Decision: ADR 0003, accepted 2026-10-31 (#35). Shipped in 0.3.0; open only for the exit evidence below. Target: 0.3.0. ## Sub-issues - [x] #18 Accept ADR 0003 and record each owner's consent - [x] #19 Add the assess container for Jev triage - [x] #20 Show the triage class on the read tools - [x] #21 Add mailmind replay, the report before the wake rule - [x] #22 Add the wake queue and the mail_wakes read tool ## Exit criteria Estate tasks for this phase (owner consent) live on the deploying estate's private tracker. - One replay report from a test instance recorded before the wake rule is enabled. - A wake from a test instance appears in `mail_wakes`, and a scheduled Grok Automation reads it and then calls `mail_read`.
svc-agent-writer changed title from Phase 3: Jev triage and Matrix wake (0.3.0) to Phase 3: Jev triage and pulled wakes (0.3.0) 2026-10-31 04:03:53 +00:00
Author
Member

This was generated by AI during triage.

Every sub-issue listed in the body is closed. Closing the epic.

> *This was generated by AI during triage.* Every sub-issue listed in the body is closed. Closing the epic.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
dev/mail-mind-mcp#8
No description provided.