Add guarded JMAP draft editing and undo #206

Merged
svc-svd-writer merged 2 commits from feat/svd-dev-mail-mind-mcp-196-mail-draft-edit-on-jmap-guard-88adb39b into main 2026-11-12 22:50:46 +00:00
Collaborator

Import replacement drafts before conditionally destroying the previous draft, rechecking its blob and draft status after import. Restore previous content on edit undo and preserve reply and forward context. Add fake-server and Stalwart coverage.

Pristine baseline: 1601 passed, 0 failed, 8 skipped. Final make check: 1613 passed, 8 skipped, dependency audit clean. Stalwart integration could not run because the sibling fixture path was absent and no container daemon was reachable.

Closes #196
Co-Authored-By: gpt-6.1-terra noreply@openai.com

Import replacement drafts before conditionally destroying the previous draft, rechecking its blob and draft status after import. Restore previous content on edit undo and preserve reply and forward context. Add fake-server and Stalwart coverage. Pristine baseline: 1601 passed, 0 failed, 8 skipped. Final make check: 1613 passed, 8 skipped, dependency audit clean. Stalwart integration could not run because the sibling fixture path was absent and no container daemon was reachable. Closes #196 Co-Authored-By: gpt-6.1-terra <noreply@openai.com>
Add guarded JMAP draft editing and undo
Some checks failed
ci/woodpecker/pr/validation Pipeline was canceled
c49ac2179e
Import replacement drafts before conditionally destroying the previous draft, rechecking its blob and draft status after import. Restore previous content on edit undo and preserve reply and forward context. Add fake-server and Stalwart coverage.

Pristine baseline: 1601 passed, 0 failed, 8 skipped. Final make check: 1613 passed, 8 skipped, dependency audit clean. Stalwart integration could not run because the sibling fixture path was absent and no container daemon was reachable.

Closes #196
Co-Authored-By: gpt-6.1-terra <noreply@openai.com>
Include restored draft test in edit filter
All checks were successful
ci/woodpecker/pr/validation Pipeline was successful
5fc41e0c3d
Rename the restored-draft target test so the spec's edit filter collects it. The filtered suite passes all 15 selected tests, and the package builds successfully.

Pristine baseline from the existing PR: 1601 passed, 0 failed, 8 skipped. Stalwart integration remains unverified because no container daemon was reachable.

Closes #196
Co-Authored-By: gpt-6.1-terra <noreply@openai.com>
svc-svd-writer deleted branch feat/svd-dev-mail-mind-mcp-196-mail-draft-edit-on-jmap-guard-88adb39b 2026-11-12 22:50:46 +00:00
Sign in to join this conversation.
No description provided.